City of Morgan Hill, a city agency, holds this storm drain permit.
Municipal storm drains
This Phase II municipal storm drain permit has been in place since July 2013.
It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 5 violations and took 4 enforcement actions.
Clean WaterMunicipal storm drains
Results only in annual reports
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Phase II municipal storm drain permit
Permit order
2013-0001-DWQ
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
July 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 43M2000049
Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
May 31, 2023
Deficient ReportClass B
Violation of General Permit section E.10.a.(ii) for failure to include required information in the construction site inventory.
May 31, 2023
Deficient ReportClass B
Violation of General Permit section E.12.k for failure to comply with PCRs section E.3 requiring the City to develop an operation and maintenance (O&M) tracking database with required information regarding each structural Stormwater Control Measure (SCM) installed.
May 31, 2023
Deficient ReportClass B
Violation of General Permit provision E.12.k Post-Construction Storm Water Management Requirements for failure to comply with PCRs sections F.2.c requiring a list of which projects were granted special circumstances, alternative compliance, or other technical infeasibility and F.2.d requiring that technical infeasibility Stormwater Control Plans adequately demonstrate the basis for the technical infeasibility.
May 31, 2023
Deficient BMP ImplementationClass B
Violation of General Permit section E.12.k for failure to comply with PCRs sections B.3.c, B.4.g, and B.5.b requiring that the City not grant final project approval until stormwater control plans (SWCPs) for regulated projects sufficiently demonstrate regulated project design meets the water quality treatment [Performance Requirement No. 2], runoff retention [Performance Requirement No. 3], and peak management [Performance Requirement No. 4] performance requirements.
Mar 10, 2020
Deficient BMP ImplementationClass B
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
May 8, 2024
Notice of violation
NOV for violations of Phase II Permit Provisions related to Active Construction management and Central Coast Post Construction Requirements. 13383 Technical Report required.Status: Active
Jul 8, 2020
Notice of violation
NOV for violations of Phase II Permit Provisions related to Active Construction management and Central Coast Post Construction Requirements. 13383 Technical Report required, including monthly reporting on stormwater construction site inspection reports.Status: Historical
Oct 1, 2012
Staff enforcement letter
Status: Historical
Dec 2, 2009
Notice of violation
Status: Historical
Source: the State Water Board's stormwater system (SMARTS).