Tajiguas Sanitary Landfill Phase IVA

14470 Calle Real, Goleta, CA 93117

Santa Barbara Cnty, a county agency, operates the site. Its discharge was above the permit's action level on 5 days in the last 12 months.

14470 Calle Real, Goleta

Construction stormwater

On 5 days in the last 12 months, a discharge from this construction site was above the permit's action level for pH and turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 3The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
June 2025
Disturbed area
25.5 acres
Project
Reconstruction
Drains to
Pila Creek
State permit ID
3 42C407479

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Apr 21, 2026S-6Turbidity293 NTUabove 250 NTU
Feb 19, 2026S-4Turbidity1,000 NTUabove 250 NTU
Feb 16, 2026S-4Turbidity600 NTUabove 250 NTU
Dec 24, 2025S-4Turbidity1,000 NTUabove 250 NTU
Dec 24, 2025S-7Turbidity597 NTUabove 250 NTU
Dec 3, 2025S-6pH8.6above 8.5
All field readings (33)
DateDischarge pointpHTurbidity
Apr 21, 2026S-67.9293 NTU
Apr 20, 2026S-66.618 NTU
Feb 19, 2026S-107.717 NTU
Feb 19, 2026S-117.58.1 NTU
Feb 19, 2026S-48.11,000 NTU
Feb 19, 2026S-67.7212 NTU
Feb 18, 2026S-118.160 NTU
Feb 16, 2026S-106.937 NTU
Feb 16, 2026S-117.216 NTU
Feb 16, 2026S-47.7600 NTU
Feb 13, 2026S-68.132 NTU
Jan 9, 2026S-17.6154 NTU
Jan 8, 2026S-1827 NTU
Jan 7, 2026S-1820 NTU
Jan 7, 2026S-97.449 NTU
Jan 6, 2026S-17.5, 8.1148 NTU, 78 NTU
Jan 5, 2026S-18.144 NTU
Jan 5, 2026S-97.573 NTU
Jan 2, 2026S-67.481 NTU
Dec 31, 2025S-66.730 NTU
Dec 30, 2025S-67.842 NTU
Dec 24, 2025S-47.21,000 NTU
Dec 24, 2025S-66.5191 NTU
Dec 24, 2025S-77.1597 NTU
Dec 3, 2025S-68.613 NTU
Nov 25, 2025S-67.420 NTU
Nov 24, 2025S-67.836 NTU
Nov 21, 2025S-67.796 NTU
Nov 20, 2025S-67.865 NTU
Nov 20, 2025S-77.853 NTU
Nov 17, 2025S-66.7206 NTU
Nov 17, 2025S-77.3220 NTU
Nov 14, 2025S-67.6104 NTU

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

The neighborhood

About 2,342 people live in the neighborhood around this site in Goleta. The state scores it above 18% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6083002932. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Operator
Santa Barbara Cnty
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report