City of Atascadero

Atascadero

City of Atascadero, a city agency, holds this storm drain permit.

Municipal storm drains

This Phase II municipal storm drain permit has been in place since October 2013.

It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 20 violations and took 3 enforcement actions.

Clean WaterMunicipal storm drains

Results only in annual reports

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Phase II municipal storm drain permit
Permit order
2013-0001-DWQ
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
October 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 40M2000206

Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.

Violations the Water Board recorded

Listed as the Water Board recorded them.

DateTypeWhat the Water Board recorded
Jan 26, 2023Deficient ReportClass BFailure to comply with PCRs sections B.3.c
Jan 26, 2023Deficient ReportClass BFailure to comply with PCRs sections B.3.c.v and B.3.c.vi
Jan 26, 2023Deficient ReportClass BFailure to comply with PCRs sections B.3.c, B.4.g, and B.5.b
Jan 26, 2023Deficient ReportClass BFailure to comply with PCRs section E.3.g requiring the City to develop an operation and maintenance (O&M) tracking database
Jan 23, 2023Deficient ReportClass B
Jan 23, 2023Deficient ReportClass BFailure to include the required information in the construction site inventory
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to submit Program Effectiveness and Assessment Improvement Plan (PEAIP). Violation of 2013 General Permit, Section E.14.a.
Jun 14, 2016Late ReportClass 2Failure to submit Fiscal Year 2014/2015 Annual Report. Violation of 2013 General Permit, Section E.16.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to implement an operation and maintenance program to ensure structural SCMs, installed pursuant to the PCRs, continue to function as designed. Violation of Provision E.12.k, 2013 General Permit for failure to adhere to PCRs, Section E. The City failed to require O&M Plans and Maintenance Agreements, develop a database with information regarding each structural Stormwater Control Measure installed per the PCRs, and verify that the SCM continues to function as designed and to repair and/or replace the SCM if it is not functioning as designed.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to ensure applicable projects adequately meet the PCRs. Violation of Provision E.12.k, 2013 General Permit, for failure to adhere to PCRs, Sections B.3.c, B.4.g, and B.5.b stating the City shall not grant final project approval until the [Stormwater Control Plan] for the regulated project sufficiently demonstrates the regulated project design meets the Water Quality Treatment, Runoff Retention, and Peak Management Requirements.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to document how projects comply with PCRs Performance Requirement No. 1 [Site Design and Runoff Reduction]. Violation of Provision E.12.k, 2013 General Permit for failure to adhere to PCRs, Section B.2 requiring the City to confirm that projects comply with Site Design and Runoff Reduction Performance Requirements by means of appropriate documentation (e.g., checklists) accompanying applications for project approval.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to track applicable new and redevelopment projects that incorporated LID design principles and features pursuant to the Citys interim LID requirements and failure to submit Fiscal Year 2013/2014 Central Coast Joint Effort Tracking Report. Violation of Provisions A.1.4.e and G, 2013 General Permit, for failure to implement Guidance Document BMP PC1D requiring the City to Participate in the Water Boards Joint Effort for Hydromodification Control and implement the BMPs and Measurable Goals for Joint Effort Participants.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to track applicable new and redevelopment projects subject to the Central Coast Post-Construction Stormwater Management Requirements (PCRs, Resolution No. R3-2013-0032), and failure to submit Fiscal Years 2013/2014 and 2014/2015 PCR Annual Reports. Violation of Provision E.12.k, 2013 General Permit, for failure to adhere to PCRs, Section F.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to codify and require new and redevelopment projects to implement source control measures. Violation of Provision E.12.d, 2013 General Permit, for failure to require projects with pollutant-generating activities and sourcesto implement standard permanent and/or operation source control measures as applicable.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to develop sufficient spill response plan. Violation of Provision E.9.e, 2013 General Permit, for failure to develop and implement a spill response plan.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to conduct dry weather field sampling to detect illicit discharges. Violation of Provision E.9.c, 2013 General Permit, for failure to conduct dry weather sampling (more than 72 hours since the last rain event) of outfalls annually identified as priority areas.
Jun 14, 2016Deficient BMP ImplementationClass 2Failure to develop a sufficient outfall map. Violation of Provision E.9.a, 2013 General Permit, for failure to create and maintain an up-to-date and accurate outfall map that includes the minimum specified information.
Jun 26, 2013Deficient BMP ImplementationClass 2Violation of 2003 General Permit section D for failure to implement SWMP BMP PE3 Target Homeowner Community.
Jun 26, 2013Deficient BMP ImplementationClass 2Violation of 2003 General Permit section D for failure to implement SWMP BMP GH3 Municipal Facilities.
Jun 26, 2013Deficient BMP ImplementationClass 2Violation of 2003 General Permit section D for failure to implement SWMP BMP GH1 Municipal Employee Training and Education.

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
Jul 27, 2023Notice of violationIssue NOV to correct six violationsStatus: Active
Oct 18, 2016Notice of violationNOV & 13267/13383 Investigative Order for Technical Report by 1/16/17.Status: Historical
Jun 17, 2012Staff enforcement letterViolations detected during partial program audit.Status: Active

Source: the State Water Board's stormwater system (SMARTS).

Location and details

Permits and IDs

Operator
City of Atascadero
Covered by
Municipal storm drain permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report