City of Arroyo Grande, a city agency, holds this storm drain permit.

Municipal storm drains

This Phase II municipal storm drain permit has been in place since August 2013.

It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 12 violations and took 5 enforcement actions.

Clean WaterMunicipal storm drains

Results only in annual reports

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Phase II municipal storm drain permit
Permit order
2013-0001-DWQ
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
August 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 40M2000178

Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.

Violations the Water Board recorded

Listed as the Water Board recorded them.

DateTypeWhat the Water Board recorded
Oct 16, 2026Late ReportClass BFailure to submit the 2025-2026 Annual Report
Oct 1, 2022Deficient ReportClass BPhase II Small MS4 Provision E.12.k -Failure to comply with multiple parts of PCRs section E.3 - Structural Stormwater Control Measure (SCM) Operations and Maintenance (O&M) Database
Jun 15, 2022Deficient BMP ImplementationClass BFailure to implement General Permit provision E.9.c.(i) - Field sampling to detect illicit discharges. The City must correct this violation as soon as possible. This violation can be corrected by conducting the required sampling. City must submit the 13383 Techncial Report.
Jun 15, 2022Deficient BMP ImplementationClass BFailure to implement General Permit provision E.9.b.(ii)(e) - Illicit Discharge Source/Facility Inventory. The City must correct this violation as soon as possible. This violation can be corrected by conducting the surveys required by provision E.9.b.(ii)(e).
Oct 15, 2015Deficient ReportClass 2Violation of General Permit Provision E.16.a for failure to certify compliance with all requirements of this permit. If a Permittee is unable to certify compliance with a requirement, the Permittee must submit in SMARTS the reason for failure to comply, a description and schedule of tasks necessary to achieve compliance, and an estimated date for achieving full compliance.
Oct 15, 2015Deficient ReportClass 2Violation of General Permit Attachment F, Standard Provision Number 12, for failure to certify that the information in the second year Annual Report was true, accurate, and complete.
Oct 15, 2015Late ReportClass 2Violation of General Permit Provision E.14.a.iii for failure to submit the Citys Program Effectiveness Assessment and Improvement Plan (PEAIP) by the second year Annual Report.
Dec 14, 2013Late ReportClass 3The City of Arroyo Grande did not submit its Year 4 Annual Report, pursuant to Phase II MS4 Permit Order No. 2003-0005, to cover the Reporting Period: September 16, 2012 to June 30, 2013. The Year 4 Annual Report was due to the Central Coast Water Board by December 14, 2013.Note: This violation is associated with the previous Phase II Permit 2012-2013 annual reporting period. CIWQS was formerly used to track violations under the previous Permit; however, Water Board staff detected this violation after the transition to SMARTS.
Oct 29, 2013Unauthorized NSWDClass 21. Failure to prevent illicit discharges to the MS4 a. Violation of 2003 General Permit Section D.2.c(1) for failure to, Develop, implement, and enforce a program to detect and eliminate illicit discharges into the regulated Small MS4.b. Violation of 2003 General Permit Section D.2.c(5) for failure to, Inform public employeesof the hazards that are generally associated with illegal discharges and improper disposal of waste. c. Violation of 2003 General Permit section D for failure to implement SWMP BMP MO3 requiring the City to, reduce the amount of pollutants in stormwater runoff by inspecting and properly maintaining the storm sewer system.
Mar 15, 2013Deficient BMP ImplementationClass 23. Failure to implement adequate good housekeeping practices for municipal operationsa. Violation of 2003 General Permit section D for failure to implement SWMP BMP MO4 requiring the City to, reduce pollutants in stormwater runoff by preventing the discharge of pollutants from [City] Public Works Corporation Yards.
Mar 15, 2013Deficient BMP ImplementationClass 22. Failure to implement measures to ensure that all active construction sites, greater than or equal to one acre in size and smaller projects that are part of a common plan of development that is one acre or more in size, installed appropriate erosion and sediment controls a. Violation of 2003 General Permit Section D.2.d(6) for failure to develop and implement, procedures for site inspection and enforcement of control measures.b. Violation of 2003 General Permit section D for failure to implement SWMP Best Management Practice (BMP) CON3B requiring the City to, inspect the installation of erosion/sediment controls on private property.
Mar 15, 2013Deficient BMP ImplementationClass 2Failure to develop enforcement procedures to effectively regulate construction site stormwater management. Violation of 2003 General Permit Section D.2.d(6) for failure to develop and implement procedures for enforcement of control measures.

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
Nov 4, 2026Notice of violationFailure to submit the 2025-2026 Annual ReportStatus: Active
Jul 25, 2023Notice of violationIssue NOV to correct one violationStatus: Active
Aug 10, 2022Notice of violationSee attached 13383 report order that includes the following required Actions. 1. Information demonstrating correction of alleged Violations 1 and 2, including:a. A description of steps the City has taken or will take to correct the alleged violations;b. An updated source/facility inventory to meet the requirements of General Permit provisions E.9.b.(ii)(a) and E.9.b.(ii)(b);c. A description of procedures that the City will implement to proactively identify possible illicit discharges originating from priority areas, as required by General Permit provision E.9.a.(ii)(e); andd. Documentation of outfall inspections and sampling conducted in accordance with General Permit provision E.9.c.2. A description of steps the City has taken or will take to correct Deficiency 1. If the deficiency has not been corrected, identify the steps the City will take and the date the deficiency will be corrected.3. A description of steps the City has taken or will take to address Recommendations 1 and 2.Status: Historical
Feb 8, 2016Notice of violationNOV cites late and deficient 2nd annual report.Status: Historical
Jun 3, 2014Staff enforcement letterSEL for violations discovered during 3/15/13 inspection, and reported by a third party 10/29/13. In the City's next Annual Report, due October 15, 2014, the City must include information that identifies which violations and deficiencies the City corrected, and which violations and deficiencies the City has not yet corrected with a corrective action time schedule.Status: Historical

Source: the State Water Board's stormwater system (SMARTS).

Location and details

Permits and IDs

Operator
City of Arroyo Grande
Covered by
Municipal storm drain permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report