City of Pismo Beach, a city agency, holds this storm drain permit.
Municipal storm drains
This Phase II municipal storm drain permit has been in place since July 2013.
It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 5 violations and took 4 enforcement actions.
Clean WaterMunicipal storm drains
Results only in annual reports
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Phase II municipal storm drain permit
Permit order
2013-0001-DWQ
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
July 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 40M2000112
Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
Oct 1, 2022
Deficient ReportClass B
Phase II Small MS4 Provision E.12.k -Failure to comply with multiple parts of PCRs section E.3 - Structural Stormwater Control Measure (SCM) Operations and Maintenance (O&M) Database
Jun 29, 2015
Deficient BMP ImplementationClass 2
Failure to provide requested records that show compliance with 2013 General Permit, Section E.10.b - Construction Plan Review and Approval Proceduresa. re records of written approval of erosion and sediment control plans.
Jun 29, 2015
Deficient BMP ImplementationClass 2
Failure to maintain an inventory of all active construction projects subject to the local stormwater ordinance. Violation of 2013 General Permit, Section E.10.a.
Jun 29, 2015
Deficient BMP ImplementationClass 2
Failure to apply post-construction stormwater requirements to all applicable projects. Violation of Provisions A.1.4.e and G, 2013 General Permit, for failure to implement the Citys Guidance Document BMP 5.12 requiring the City to, apply LID principles to new and redevelopment projects during the two year period preceding adoption of hydromodification control criteria. [interim Low Impact Development (LID) requirements]
Oct 15, 2014
Deficient BMP ImplementationClass 2
Failure to educate municipal staff, including plan reviewers and inspectors on LID within the first year of enrollment. a. Violation of Provisions A.1.4.e and G, 2013 General Permit, for failure to implement Guidance Document BMP 5.4
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Jul 25, 2023
Notice of violation
Issue NOV to correct one violationStatus: Active
Apr 15, 2016
Notice of violation
NOV and 13267 Order for violations detected during 6/29/15 inspection and records review. Requires technical report by May 2, 2016.Status: Historical
May 28, 2013
Staff enforcement letter
For violations detected during the partial compliance follow-up audit performed on December 13, 2012. Also addressed in 4/18/12 SEL Reg Measure 384711. Alleges continued violation of #2 and #4 from the 4/18/12 NOV.Status: Historical
Apr 18, 2012
Staff enforcement letter
For violations detected during partial compliance audit performed on June 30, 2011, and February 7, 2012.Status: Historical
Source: the State Water Board's stormwater system (SMARTS).