City of Paso Robles

Paso Robles

City of Paso Robles, a city agency, holds this storm drain permit.

Municipal storm drains

This Phase II municipal storm drain permit has been in place since July 2013.

It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 5 violations and took 5 enforcement actions.

Clean WaterMunicipal storm drains

Results only in annual reports

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Phase II municipal storm drain permit
Permit order
2013-0001-DWQ
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
July 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 40M2000012

Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.

Violations the Water Board recorded

Listed as the Water Board recorded them.

DateTypeWhat the Water Board recorded
May 13, 2022Deficient BMP ImplementationClass BViolation of General Permit provision E.12.k for failure to comply with PCRs section D.2.The City must correct this violation as soon as possible. This violation can be corrected by:1. Improving procedures to verify prior to permit closure and occupancy that regulated projects have been constructed according to the SWCP and other applicable plans, and2. Implementing SCMs on-site at Firestone Walker so that the regulated project complies with the PCRs or, if on-site SCMs are not proposed, implementing SCMs elsewhere that will achieve the lost treatment, retention, and peak flow capacity resulting from the violations.
May 13, 2022Deficient BMP ImplementationClass BViolation of General Permit provision E.12.k for failure to comply with PCRs sections B.3.c.v and B.3.c.vi providing that the City require the total project site area and total new and replaced impervious area be included in the SWCP.The City must correct this violation as soon as possible. This violation can be corrected by:1. Improving procedures to verify all SWCPs address stormwater runoff from all portions of a Regulated Project, including portions in the public right of way, prior to granting final approval for the Regulated Project, and2. Implementing stormwater control measures (SCMs) on-site at The Oaks Assisted Living and Enterprise Rent-a-car so that the Regulated Projects comply with the PCRs or, if on-site SCMs are not proposed, implementing SCMs elsewhere that will achieve the lost treatment, retention, and peak flow capacity resulting from the violations.
May 13, 2022Deficient BMP ImplementationClass BViolation of General Permit provision E.12.k for failure to comply with PCRs sections B.3.c, B.4.g, and B.5.b requiring that the City not grant final project approval until the Stormwater Control Plan for the Regulated Project sufficiently demonstrates the Regulated Project design meets the Water Quality Treatment [Performance Requirement No. 2], Runoff Retention [Performance Requirement No. 3], and Peak Management [Performance Requirement No. 4] Performance Requirements - Attached Inspection report and NOV contain specific actions required to correct the violations.
May 13, 2022Deficient ReportClass BViolation of General Permit provision E.12.k for failure to comply with PCRs section F.2.i requiring the City to report structural SCM operation and maintenance database elements identified in PCRs section E.3
May 7, 2015Deficient BMP ImplementationClass 2The City has approved project applications that violated the Interim LID requirements.

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
Sep 23, 2022Notice of violationA description of steps the City has taken or will take to correct alleged Violations 1 through 4, for each occurrence and location identified above. For violations that have not been corrected, identify the date they will be corrected.Status: Active
Nov 9, 2015Notice of violationThe City must correct the violations as soon as possible. In the City's next Annual Report, due October 15, 2016, the City must identify which violations identified in this letter the City corrected, and which violations identified in this letter the City has not yet corrected. For the violations the City has corrected, the City must describe how it corrected those violations.Status: Active
May 30, 2012Notice of violationStatus: Historical
Feb 8, 2007Notice of violationNOV for Failure to submit the City's storm water ordinance.Status: Historical
Sep 27, 2006Notice of violationNOV issued for deficient annual report and failure to properly implement BMPs.Status: Historical

Source: the State Water Board's stormwater system (SMARTS).

Location and details

Permits and IDs

Operator
City of Paso Robles
Covered by
Municipal storm drain permit

The state stormwater record