CalPortland Construction has held an industrial stormwater permit for the site since August 2008. Its industry is listed as asphalt paving mixtures and blocks. The permit requires samples of its runoff, and the last one it filed is from January 2023. Under its stormwater permit it is at Exceedance Response Action Level 2 for suspended solids, which means it must file an action plan with the state.

188 Volpi Ysabel, Templeton

Industrial stormwater

This site last filed a sample of its runoff in January 2023.

The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled none of the 11 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred. It also gave another reason.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Not tested in the latest year

Figures are from the last year each was tested.

Suspended solids

330 mg/L1 result

100 mg/L

Exceedance Response Action Level 2

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

9 results as a table
SampledDrainage areaResult
Jan 5, 2023Sample Point 1330 mg/L
Dec 14, 2021Sample Point 153 mg/L
Feb 4, 2019Sample Point 1140 mg/L
Jan 17, 2019Sample Point 187 mg/L
Nov 29, 2018Sample Point 1240 mg/L
Jan 9, 2018Sample Point 1380 mg/L
Jan 12, 2017Sample Point 1200 mg/L
Mar 11, 2016Sample Point 1480 mg/L
Jan 19, 2016Sample Point 11,100 mg/L

Oil and grease

2.2 mg/L1 result

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

9 results as a table
SampledDrainage areaResult
Jan 5, 2023Sample Point 12.2 mg/L
Dec 14, 2021Sample Point 12.5 mg/L
Feb 4, 2019Sample Point 1Not detected
Jan 17, 2019Sample Point 13 mg/L
Nov 29, 2018Sample Point 12.3 mg/L
Jan 9, 2018Sample Point 15.1 mg/L
Jan 12, 2017Sample Point 15.4 mg/L
Mar 11, 2016Sample Point 17.2 mg/L
Jan 19, 2016Sample Point 130 mg/L

pH

8 to 81 result

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

9 results as a table
SampledDrainage areaResult
Jan 5, 2023Sample Point 18
Dec 14, 2021Sample Point 19
Feb 4, 2019Sample Point 19
Jan 17, 2019Sample Point 19
Nov 29, 2018Sample Point 17
Jan 9, 2018Sample Point 17
Jan 12, 2017Sample Point 17
Mar 11, 2016Sample Point 16
Jan 19, 2016Sample Point 17.5

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 11 storms sampledTold the state: not enough qualifying storms occurred; another reason

2024-25

0 of 10 storms sampledTold the state it did not sample every required storm

2023-24

0 of 12 storms sampledTold the state it did not sample every required storm

2022-23

1 of 16 storms sampledTold the state it did not sample every required storm

2021-22

1 of 8 storms sampledTold the state it did not sample every required storm

2020-21

0 of 7 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Paso Robles (USC00046730), 3.3 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Salinas River.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 3,093 people live in the neighborhood around this site in Paso Robles. The state scores it above 8% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6079010302. The score covers the whole neighborhood and does not measure this site's own effect.

Same operator

CalPortland Construction holds 7 other stormwater permits:

Permits and IDs

Industry
Asphalt Paving Mixtures and Blocks
Operator
CalPortland Construction
Covered by
Industrial stormwater permit
Stormwater permit since
August 2008
Site size
19.3 acres
State stormwater ID
3 40I021765

The state stormwater record

Report pollution at this site