Animal Health

1 Grand Avenue, San Luis Obispo, CA 93407

Cal Poly State University SLO operates the site. Its discharge was above the permit's action level on 2 days in the last 12 months.

1 Grand Avenue, San Luis Obispo

Construction stormwater

On 2 days in the last 12 months, a discharge from this construction site was above the permit's action level for pH and turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 3The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
March 2024
Disturbed area
3 acres
Project
Education & Research
Drains to
Stenner Creek
State permit ID
3 40C403439

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Jan 5, 2026South Slope into Drumm ReservoirTurbidity345 NTUabove 250 NTU
Dec 24, 2025South Slope into CorralpH8.9above 8.5
Dec 24, 2025South Slope into CorralTurbidity623 NTUabove 250 NTU
Dec 24, 2025South Slope into Drumm ReservoirpH3.5below 6.5
Dec 24, 2025South Slope into Drumm ReservoirTurbidity683 NTUabove 250 NTU
Dec 24, 2025Storm DrainpH8.7above 8.5
Dec 24, 2025Storm DrainTurbidity845 NTUabove 250 NTU
Nov 17, 2025Parking LotTurbidity550 NTUabove 250 NTU
Nov 17, 2025South Slope into CulvertTurbidity900 NTUabove 250 NTU
Feb 13, 2025DI on roadTurbidity526 NTUabove 250 NTU
Feb 6, 2025DI on roadTurbidity257 NTUabove 250 NTU
All field readings (12)
DateDischarge pointpHTurbidity
Jan 5, 2026South Slope into Drumm Reservoir8.3345 NTU
Dec 26, 2025South Slope into Corral8.323 NTU
Dec 24, 2025South Slope into Corral8.9623 NTU
Dec 24, 2025South Slope into Drumm Reservoir3.5683 NTU
Dec 24, 2025Storm Drain8.7845 NTU
Nov 17, 2025Parking Lot8.1550 NTU
Nov 17, 2025South Slope into Corral8.5199 NTU
Nov 17, 2025South Slope into Culvert8.5900 NTU
Nov 17, 2025South Slope into Drumm Reservoir7.9109 NTU
Feb 13, 2025DI on road8.3526 NTU
Feb 6, 2025DI on road8.2257 NTU
Feb 5, 2025DI on road8.479 NTU

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

Permits and IDs

Operator
Cal Poly State University SLO
Covered by
Construction stormwater permit