City of Salinas

Salinas

City of Salinas, a city agency, holds this storm drain permit.

Municipal storm drains

This Phase I municipal storm drain permit has been in place since June 2012.

It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 2 violations and took 8 enforcement actions.

Clean WaterMunicipal storm drains

Results only in annual reports

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Phase I municipal storm drain permit
Permit order
R3-2019-0073
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
June 2012
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 27M1000085

Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.

Violations the Water Board recorded

Listed as the Water Board recorded them.

DateTypeWhat the Water Board recorded
Nov 7, 2016Deficient BMP ImplementationClass 2Failure to conduct inspections of construction sites per Provision K.6 of the 2012 Permit, including failure to assess implementation and maintenance of required minimum BMPs. Unannounced inspections of 3 construction sites in city boundaries, construction sites enrolled in CGP. City appeared to not implementing Phase 1 permit required construction site stormwater inspections.
Nov 7, 2016Deficient BMP ImplementationClass 2Failure by the City to require all construction sites to install and maintain minimum construction site BMPs, and implement source control BMPs per Provisions K.3.a and K.4.b.iv of the 2012 Permit, respectively. Unannounced inspections of 3 construction sites in city boundaries, construction sites enrolled in CGP. City appeared to not implementing Phase 1 permit required construction site stormwater inspections.

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
Feb 9, 2017Notice of violationNOV and 13267/13383 Investigative Order citing 2 violations detected during 11/07/16 inspection of construction sites within City's jurisdiction.Status: Historical
Feb 9, 2017Notice of violationStatus: Historical
Jun 18, 2013Notice of violationAddresses 7 violations detected during 3/14/13 partial compliance audit.Status: Historical
Oct 24, 2012Notice of violationStatus: Historical
Jun 12, 2012Staff enforcement letterEmailed Ron Cole and Gary Pedersen to inform them of violation of failure to conduct sediment toxicity and bioassessment monitoring. Confirmed they will perform monitoring week of June 25, 2012 and will notify us of completion.Status: Historical
Oct 5, 2011Verbal warningStatus: Historical
Jan 8, 2007Notice of violation2nd NOV issued for ongoing violations of Waste Discharge Requirements.Status: Historical
Sep 1, 2006Notice of violationNOV issued for multiple violations of Order R3-2004-0135, namely late and/or deficient reports and plans.Status: Historical

Source: the State Water Board's stormwater system (SMARTS).

Location and details

Permits and IDs

Operator
City of Salinas
Covered by
Municipal storm drain permit

The state stormwater record

Report pollution at this site