EarthSpotterEarthSpotter

City of Vallejo

Vallejo

City of Vallejo, a city agency, holds this storm drain permit.

Municipal storm drains

This Phase I municipal storm drain permit has been in place since October 2009.

It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 2 violations and took 6 enforcement actions.

Clean WaterMunicipal storm drains

Results only in annual reports

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Phase I municipal storm drain permit
Permit order
R2-2022-0018
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
October 2009
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
2 48M1000083

Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.

Violations the Water Board recorded

Listed as the Water Board recorded them.

DateTypeWhat the Water Board recorded
Jun 30, 2025Enforcement ActionClass BAdopted CDO for the City and District for failure to meet 100 percent trash reduction by June 30, 2025The Water Board marks this violation as serious.
Mar 6, 2018Enforcement ActionClass 4Failure to comply with Provision C.10 of the MRP.

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
Dec 10, 2025Cease and desist orderOrder R2-2025-0034Adopted CDO for the City and District for failure to meet 100 percent trash reduction by June 30, 2025Status: Active
Jun 13, 2018Cease and desist orderCDO for failure to comply with Provision C.10 of the MRP.Status: Active
Mar 6, 2018Notice of violationNOV for failure to comply with Provision C.10 of the MRP.Status: Active
Mar 22, 2016Notice of violationStatus: Historical
Feb 6, 2013Notice of violationThe City failed to adhere to Provisions C.3. and C.6., which require the City to have adequate legal authority to implement both Provisions. The City also failed to develop adequate development review and permitting procedures for Provision C.3., develop an Operation and Maintenance Verification Program required for Provision C.3., and develop and implement an Enforcement Response Plan required for Provision C.6. Additionally, the City failed to develop and implement a stormwater specific inspection form and an electronic database or tabular format to track all construction site inspections. Also, the City failed to train its staff on how to conduct construction site inspections and on the requirements of the MRP.Status: Historical
Jan 8, 2013Staff enforcement letterFailed to comply with MRP requirements for corp yard inspectionsStatus: Historical

Source: the State Water Board's stormwater system (SMARTS).

Location and details

Permits and IDs

Operator
City of Vallejo
Covered by
Municipal storm drain permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report