North of Route 80 Separation to Napa County Line, Vallejo, CA 94534
Caltrans District 4, a state agency, operates the site. Its recent discharge results were within the permit's action levels.
North of Route 80 Separation to Napa County Line, Vallejo
Construction stormwater
This construction site's discharge results in the last 12 months were within the permit's action levels.
It filed 4 field readings for pH and turbidity in that time. The Water Board has recorded no violations and taken no enforcement actions here.
Clean WaterConstruction stormwater
Within the permit's action levels
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Caltrans construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
October 2025
Disturbed area
8.08 acres
Project
Transportation
Drains to
Napa River, San Pablo Bay, Lake Chabot, Carquinez Strait
State permit ID
2 48C410131
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
None
All field readings (4)
Date
Discharge point
pH
Turbidity
Feb 17, 2026
003DL03
8.4
244 NTU
Feb 17, 2026
004DL04
8
105 NTU
Nov 13, 2025
004DL04
7.1
34 NTU
Nov 13, 2025
005DL05
7.6
50 NTU
Violations the Water Board recorded
None
Enforcement actions
None
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.