| Oct 1, 2022 | Deficient ReportClass B | Phase II Small MS4 Provision E.12.k -Failure to comply with multiple parts of PCRs section E.3 - Structural Stormwater Control Measure (SCM) Operations and Maintenance (O&M) Database |
| Feb 21, 2018 | Deficient BMP ImplementationClass 3 | The County failed to promptly respond to complaints, require corrective actions in a timely manner, and require and verify that corrective actions were adequately implemented. |
| Feb 21, 2018 | Deficient BMP ImplementationClass 3 | The County failed to promptly respond to complaints, require corrective actions in a timely manner, and verify that corrective actions were adequately implemented. |
| Feb 21, 2018 | Deficient BMP ImplementationClass 3 | The County failed to promptly respond to complaints, require corrective actions in a timely manner, and verify that corrective actions were adequately implemented. |
| Feb 15, 2018 | Deficient BMP ImplementationClass 3 | The County failed to include all the required information in the tabular format for all of its installed pervious pavement systems, stormwater treatment systems, and HM controls at regulated projects, offsite projects, and Regional Projects. |
| Feb 14, 2018 | Deficient BMP ImplementationClass 3 | The County failed to maintain the required database or tabular system for business inspections. |
| Feb 9, 2018 | Deficient BMP ImplementationClass 3 | The County failed to develop an Enforcement Response Plan that fully complies with the MRP Provision C.4.c. |
| Feb 8, 2018 | Deficient BMP ImplementationClass 3 | The County failed to develop a comprehensive list of all businesses with functional aspects and types as listed in MRP Provision C.4.b.ii.(1) into its Business Inspection Plan. |
| Feb 6, 2018 | Deficient BMP ImplementationClass 3 | The County failed to inspect (1) all newly installed pervious pavement and stormwater treatment systems, and HM controls and (2) all installed pervious pavement and stormwater treatment systems, and HM controls as required by MRP Provision C.3. |
| Feb 6, 2018 | Deficient BMP ImplementationClass 3 | The County failed to develop and implement an Operation and Maintenance Inspection Plan as required by MRP Provision C.3.h.ii.(6). Because the Operation and Maintenance Inspection Plan does not exist and the tabular format is incomplete, it is unclear if the County has complied with the inspection requirements since the implementation date for the MRP, December 1, 2009. |
| Oct 26, 2017 | Deficient BMP ImplementationClass 3 | County failed to accept responsibility for the operation and maintenance of the onsite, joint, and/or offsite installed stormwater treatment systems on public projects. |
| Oct 25, 2017 | Deficient BMP ImplementationClass 3 | The County failed to accept responsibility for the operation and maintenance of the onsite, joint, and/or offsite installed stormwater treatment systems on public projects. |
| Oct 20, 2017 | Deficient BMP ImplementationClass 3 | The County failed to inspect and maintain the LID stormwater treatment systems located at the Downtown San Jose Medical Clinic. |
| Oct 20, 2017 | Deficient BMP ImplementationClass 3 | |
| Sep 19, 2017 | Deficient BMP ImplementationClass 3 | The County failed to accept responsibility for the operation and maintenance of the onsite, joint, and/or offsite installed stormwater treatment systems on public projects. |
| Apr 30, 2013 | Deficient BMP ImplementationClass 2 | [2 Violations] Violation of 2003 GP section D.1 for failure to maintain, implement, and enforce an effective SWMP. 1. Failure to develop and implement a SWPPP for each County corporation yard and all BMPs identified in facility-specific SWPPPs. 2. Failure to provide annual training for all applicable staff as SWMP specifies. |