EarthSpotterEarthSpotter

Veeco Process Equipment Inc

355 E Trimble Road, San Jose, CA 95131

Veeco Process Equipment Inc has held an industrial stormwater permit for the site since January 2023. Its industry is listed as semiconductors and related devices. Its runoff was over a state benchmark in 2 of the 4 years it sampled in the last five, most recently in 2025-26 for pH.

355 E Trimble Road, San Jose

Industrial stormwater

During the 2025-2026 rainy season, the site exceeded the benchmark set by the state for pH.

2 results were outside the allowed pH range. It has exceeded at least one benchmark in 2 of the last 4 years it sampled.

Clean WaterIndustrial stormwater

Over a state benchmark

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 3 of the 12 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because storms did not produce a discharge and storms fell outside operating hours. It also gave another reason.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Over the benchmark in 2025-26

pH

5 to 64 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

11 results as a table
SampledDrainage areaResult
Apr 21, 2026Outfall-016
Apr 10, 2026Outfall-016
Feb 17, 2026Outfall-015
Feb 10, 2026Outfall-015
Apr 1, 2025Outfall-017
Mar 12, 2025Outfall-016.8
Nov 25, 2024Outfall-016
Nov 11, 2024Outfall-016.3
Jan 22, 2024Outfall-017.3
Dec 20, 2023Outfall-016.6
Jun 6, 2023Outfall-016.6

Within the benchmark

Oil and grease

2.4 mg/L4 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

12 results as a table
SampledDrainage areaResult
Apr 21, 2026Outfall-011.9 mg/L
Apr 10, 2026Outfall-011.9 mg/L
Feb 17, 2026Outfall-012.9 mg/L
Feb 10, 2026Outfall-012.8 mg/L
Apr 1, 2025Outfall-01Not detected
Mar 12, 2025Outfall-015.1 mg/L
Nov 25, 2024Outfall-012 mg/L
Nov 11, 2024Outfall-012.4 mg/L
Mar 29, 2024Outfall-011.7 mg/L
Jan 22, 2024Outfall-011.7 mg/L
Dec 20, 2023Outfall-013.8 mg/L
Jun 6, 2023Outfall-0144 mg/L

Suspended solids

14 mg/L4 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

12 results as a table
SampledDrainage areaResult
Apr 21, 2026Outfall-0114 mg/L
Apr 10, 2026Outfall-0123 mg/L
Feb 17, 2026Outfall-016.1 mg/L
Feb 10, 2026Outfall-0114 mg/L
Apr 1, 2025Outfall-013.9 mg/L
Mar 12, 2025Outfall-0114 mg/L
Nov 25, 2024Outfall-012.4 mg/L
Nov 11, 2024Outfall-0114 mg/L
Mar 29, 2024Outfall-016.6 mg/L
Jan 22, 2024Outfall-013.6 mg/L
Dec 20, 2023Outfall-0121 mg/L
Jun 6, 2023Outfall-017.6 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

3 of 12 storms sampledTold the state: storms did not produce a discharge; storms fell outside operating hours; another reason

2024-25

4 of 14 storms sampledTold the state it sampled every required storm

2023-24

3 of 19 storms sampledTold the state it did not sample every required storm

2022-23

0 of 8 storms sampledTold the state it did not sample every required storm

2021-22

0 of 0 storms sampledNo annual report on file

2020-21

0 of 0 storms sampledNo annual report on file

Rainfall comes from the daily records of NOAA station San Jose (USW00023293), 2.2 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Guadalupe River.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 11,179 people live in the neighborhood around this site in San Jose. The state scores it above 31% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6085505006. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Semiconductors and Related Devices
Operator
Veeco Process Equipment Inc
Covered by
Industrial stormwater permit
Stormwater permit since
January 2023
Site size
5.3 acres
State stormwater ID
2 43I030078

The state stormwater record

Other sites nearby

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report