EarthSpotterEarthSpotter

Lanteris Space LLC

2288 Charleston Road Bldg 48, Mountain View, CA 94043

Maxar Holding Inc has held an industrial stormwater permit for the site since February 2013. Its industry is listed as communications equipment. Every pollutant it tested in 2025-26 averaged within the state benchmarks.

2288 Charleston Road Bldg 48, Mountain View

Industrial stormwater

During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.

That is based on 12 lab results from 4 storm days.

Clean WaterIndustrial stormwater

Within the state benchmarks

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 4 of the 13 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. This site says it qualifies for a reduced schedule.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

Suspended solids

31 mg/L4 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

36 results as a table
SampledDrainage areaResult
May 28, 2026Bldg 48 East End5.2 mg/L
Apr 10, 2026Bldg 48 East End57 mg/L
Oct 13, 2025Bldg 48 East End41 mg/L
Oct 2, 2025Bldg 48 East End22 mg/L
Feb 4, 2025Bldg 48 East End30 mg/L
Jan 3, 2025Bldg 48 East End19 mg/L
Dec 12, 2024Bldg 48 East End9.8 mg/L
Nov 25, 2024Bldg 48 East End4.2 mg/L
Jan 25, 2024Bldg 48 East End9 mg/L
Jan 9, 2024Bldg 48 East End112 mg/L
Dec 18, 2023Bldg 48 East End6.8 mg/L
Nov 29, 2023Bldg 48 East End70 mg/L
Jan 13, 2023Bldg 48 East End129 mg/L
Jan 4, 2023Bldg 48 East End8 mg/L
Dec 27, 2022Bldg 48 East End57 mg/L
Dec 1, 2022Bldg 48 East End73 mg/L
Apr 21, 2022Bldg 48 East End10 mg/L
Mar 28, 2022Bldg 48 East End4.8 mg/L
Dec 22, 2021Bldg 48 East End5.2 mg/L
Dec 7, 2021Bldg 48 East End21 mg/L
Jan 4, 2021Bldg 48 East End26 mg/L
Dec 17, 2020Bldg 48 East End12 mg/L
Jan 16, 2020Bldg 48 East End16 mg/L
Dec 4, 2019Bldg 48 East End3.3 mg/L
Jan 31, 2019Bldg 48 East End9.1 mg/L
Jan 15, 2019Bldg 48 East End71 mg/L
Jan 8, 2018Bldg 48 East End20 mg/L
Nov 16, 2017Bldg 48 East End17 mg/L
Mar 24, 2017Bldg 48 East End101 mg/L
Feb 3, 2017Bldg 48 East End15 mg/L
Dec 8, 2016Bldg 48 East End73 mg/L
Oct 27, 2016Bldg 48 East End7.8 mg/L
Apr 22, 2016Bldg 48 East End71 mg/L
Mar 11, 2016Bldg 48 East End89 mg/L
Dec 3, 2015Bldg 48 East End357 mg/L
Nov 2, 2015Bldg 48 East End47 mg/L

pH

7 to 74 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

36 results as a table
SampledDrainage areaResult
May 28, 2026Bldg 48 East End7
Apr 10, 2026Bldg 48 East End7
Oct 13, 2025Bldg 48 East End7
Oct 2, 2025Bldg 48 East End7
Feb 4, 2025Bldg 48 East End7
Jan 3, 2025Bldg 48 East End7
Dec 12, 2024Bldg 48 East End7
Nov 25, 2024Bldg 48 East End7
Jan 25, 2024Bldg 48 East End7
Jan 9, 2024Bldg 48 East End6.5
Dec 18, 2023Bldg 48 East End7
Nov 29, 2023Bldg 48 East End7
Jan 13, 2023Bldg 48 East End7
Jan 4, 2023Bldg 48 East End7
Dec 27, 2022Bldg 48 East End6.5
Dec 1, 2022Bldg 48 East End7
Apr 21, 2022Bldg 48 East End6.5
Mar 28, 2022Bldg 48 East End7
Dec 22, 2021Bldg 48 East End7
Dec 7, 2021Bldg 48 East End7
Jan 4, 2021Bldg 48 East End7
Dec 17, 2020Bldg 48 East End7
Jan 16, 2020Bldg 48 East End7
Dec 4, 2019Bldg 48 East End7
Jan 31, 2019Bldg 48 East End7
Jan 15, 2019Bldg 48 East End7
Jan 8, 2018Bldg 48 East End6
Nov 16, 2017Bldg 48 East End7
Mar 24, 2017Bldg 48 East End6
Feb 3, 2017Bldg 48 East End6
Dec 8, 2016Bldg 48 East End6
Oct 27, 2016Bldg 48 East End6
Apr 22, 2016Bldg 48 East End6
Mar 11, 2016Bldg 48 East End6
Dec 3, 2015Bldg 48 East End6
Nov 2, 2015Bldg 48 East End6

Oil and grease

1.6 mg/L4 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

36 results as a table
SampledDrainage areaResult
May 28, 2026Bldg 48 East EndNot detected
Apr 10, 2026Bldg 48 East End2.4 mg/L
Oct 13, 2025Bldg 48 East End4.1 mg/L
Oct 2, 2025Bldg 48 East EndNot detected
Feb 4, 2025Bldg 48 East EndNot detected
Jan 3, 2025Bldg 48 East EndNot detected
Dec 12, 2024Bldg 48 East EndNot detected
Nov 25, 2024Bldg 48 East End1.6 mg/L
Jan 25, 2024Bldg 48 East EndNot detected
Jan 9, 2024Bldg 48 East End5.4 mg/L
Dec 18, 2023Bldg 48 East EndNot detected
Nov 29, 2023Bldg 48 East EndNot detected
Jan 13, 2023Bldg 48 East End2.2 mg/L
Jan 4, 2023Bldg 48 East EndNot detected
Dec 27, 2022Bldg 48 East EndNot detected
Dec 1, 2022Bldg 48 East End1.1 mg/L
Apr 21, 2022Bldg 48 East End1.7 mg/L
Mar 28, 2022Bldg 48 East EndNot detected
Dec 22, 2021Bldg 48 East EndNot detected
Dec 7, 2021Bldg 48 East EndNot detected
Jan 4, 2021Bldg 48 East EndNot detected
Dec 17, 2020Bldg 48 East EndNot detected
Jan 16, 2020Bldg 48 East End1.5 mg/L
Dec 4, 2019Bldg 48 East EndNot detected
Jan 31, 2019Bldg 48 East EndNot detected
Jan 15, 2019Bldg 48 East End1.9 mg/L
Jan 8, 2018Bldg 48 East End1.7 mg/L
Nov 16, 2017Bldg 48 East EndNot detected
Mar 24, 2017Bldg 48 East EndNot detected
Feb 3, 2017Bldg 48 East End1.2 mg/L
Dec 8, 2016Bldg 48 East End2.5 mg/L
Oct 27, 2016Bldg 48 East End1.2 mg/L
Apr 22, 2016Bldg 48 East End3.4 mg/L
Mar 11, 2016Bldg 48 East EndNot detected
Dec 3, 2015Bldg 48 East End8.6 mg/L
Nov 2, 2015Bldg 48 East EndNot detected

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. This site told the state it qualifies for a reduced schedule with fewer samples. When a site samples fewer than its schedule asks, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

4 of 13 storms sampledTold the state it sampled every required storm

2024-25

4 of 11 storms sampledTold the state it sampled every required storm

2023-24

2 of 19 storms sampledTold the state it sampled every required storm

2022-23

4 of 17 storms sampledTold the state it sampled every required storm

2021-22

3 of 9 storms sampledTold the state it sampled every required storm

2020-21

1 of 7 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Sunnyvale 1.9 SE (US1CASC0003), 6.4 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Charleston Slough.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 3,175 people live in the neighborhood around this site in Mountain View. The state scores it above 43% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6085509304. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Communications Equipment, NEC
Operator
Maxar Holding Inc
Covered by
Industrial stormwater permit
Stormwater permit since
February 2013
Site size
2.51 acres
Paved or roofed
85% of the site
State stormwater ID
2 43I024050

The state stormwater record

Other sites nearby

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report