EarthSpotterEarthSpotter

Miller Property

7 Bournemouth Rd., Saint Helena, CA 94574

V&L Holdings operates the site. Its discharge was above the permit's action level on 4 days in the last 12 months.

7 Bournemouth Rd., Saint Helena

Construction stormwater

On 4 days in the last 12 months, a discharge from this construction site was above the permit's action level for pH and turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 3The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
November 2023
Disturbed area
0.99 acres
Project
Residential
Drains to
Napa River - Non tidal
State permit ID
2 28C402545

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Nov 18, 2026SP-4pH8.6above 8.5
Nov 13, 2026SP-4pH9.1above 8.5
Nov 13, 2026SP-4Turbidity703 NTUabove 250 NTU
Jan 5, 2026SP-1pH8.9above 8.5
Dec 19, 2025SP-1pH9.1above 8.5
Dec 19, 2025SP-1Turbidity1,000 NTUabove 250 NTU
Dec 16, 2024SP-1Turbidity1,000 NTUabove 250 NTU
Dec 16, 2024SP-2pH10above 8.5
Dec 16, 2024SP-2Turbidity484 NTUabove 250 NTU
Dec 13, 2024SP-1Turbidity1,000 NTUabove 250 NTU
Nov 22, 2024SP-1Turbidity1,000 NTUabove 250 NTU
Nov 21, 2024SP-1Turbidity1,000 NTUabove 250 NTU
Nov 21, 2024SP-4Turbidity254 NTUabove 250 NTU
Nov 20, 2024SP-4Turbidity411 NTUabove 250 NTU
All field readings (20)
DateDischarge pointpHTurbidity
Nov 18, 2026SP-48.646 NTU
Nov 13, 2026SP-49.1703 NTU
Feb 17, 2026SP-48.476 NTU
Jan 5, 2026SP-18.993 NTU
Dec 19, 2025SP-19.11,000 NTU
Nov 13, 2025SP-18.2217 NTU
Feb 4, 2025SP-17.319 NTU
Dec 16, 2024SP-18.11,000 NTU
Dec 16, 2024SP-210484 NTU
Dec 16, 2024SP-4835 NTU
Dec 13, 2024SP-17.71,000 NTU
Dec 13, 2024SP-46.9139 NTU
Nov 22, 2024SP-17.11,000 NTU
Nov 22, 2024SP-47.437 NTU
Nov 21, 2024SP-17.31,000 NTU
Nov 21, 2024SP-47.3254 NTU
Nov 20, 2024SP-47.6411 NTU
Mar 29, 2024SP-27.215 NTU
Mar 29, 2024SP-47.142 NTU
Feb 29, 2024SP-48.2132 NTU

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

The neighborhood

About 4,540 people live in the neighborhood around this site in Angwin. The state scores it above 16% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6055201700. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Operator
V&L Holdings
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report