EarthSpotterEarthSpotter

Acme Landfill

950 Waterbird Way, Martinez, CA 94553

Acme Fill Corp has held an industrial stormwater permit for the site since October 2022. Its industry is listed as refuse systems. Every pollutant it tested in 2025-26 averaged within the state benchmarks.

950 Waterbird Way, Martinez

Industrial stormwater

During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.

That is based on 8 lab results from 2 storm days.

Clean WaterIndustrial stormwater

Within the state benchmarks

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 2 of the 14 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred, storms did not produce a discharge, and storms fell outside operating hours.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

pH

7 to 7.12 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

8 results as a table
SampledDrainage areaResult
Feb 17, 2026MP-17.1
Nov 20, 2025MP-17
Feb 13, 2025MP-16.5
Feb 1, 2024MP-17
Dec 19, 2023MP-16.5
Mar 29, 2023MP-17
Mar 22, 2023MP-17
Dec 27, 2022MP-17

Suspended solids

14 mg/L2 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

8 results as a table
SampledDrainage areaResult
Feb 17, 2026MP-110 mg/L
Nov 20, 2025MP-118 mg/L
Feb 13, 2025MP-123 mg/L
Feb 1, 2024MP-15.2 mg/L
Dec 19, 2023MP-18.4 mg/L
Mar 29, 2023MP-13.4 mg/L
Mar 22, 2023MP-12 mg/L
Dec 27, 2022MP-110 mg/L

Oil and grease

Not detected2 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

8 results as a table
SampledDrainage areaResult
Feb 17, 2026MP-1Not detected
Nov 20, 2025MP-1Not detected
Feb 13, 2025MP-1Not detected
Feb 1, 2024MP-1Not detected
Dec 19, 2023MP-1Not detected
Mar 29, 2023MP-1Not detected
Mar 22, 2023MP-1Not detected
Dec 27, 2022MP-1Not detected

Iron

0.41 mg/L2 results

1 mg/L

All results for iron

Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.

8 results as a table
SampledDrainage areaResult
Feb 17, 2026MP-10.15 mg/L
Nov 20, 2025MP-10.67 mg/L
Feb 13, 2025MP-10.61 mg/L
Feb 1, 2024MP-10.36 mg/L
Dec 19, 2023MP-10.32 mg/L
Mar 29, 2023MP-10.21 mg/L
Mar 22, 2023MP-10.092 mg/L
Dec 27, 2022MP-12.4 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

2 of 14 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; storms fell outside operating hours

2024-25

1 of 13 storms sampledTold the state it did not sample every required storm

2023-24

2 of 22 storms sampledTold the state it did not sample every required storm

2022-23

3 of 14 storms sampledTold the state it did not sample every required storm

2021-22

0 of 0 storms sampledNo annual report on file

2020-21

0 of 0 storms sampledNo annual report on file

Rainfall comes from the daily records of NOAA station Martinez 0.8 SSE (US1CACC0001), 2.4 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Walnut Creek.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 3,276 people live in the neighborhood around this site in Martinez. The state scores it above 68% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6013320001. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Refuse Systems
Operator
Acme Fill Corp
Covered by
Industrial stormwater permit
Stormwater permit since
October 2022
Site size
383 acres
State stormwater ID
2 07I029959

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report