Acme Fill Corp has held an industrial stormwater permit for the site since October 2022. Its industry is listed as refuse systems. Every pollutant it tested in 2025-26 averaged within the state benchmarks.
950 Waterbird Way, Martinez
Industrial stormwater
During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.
That is based on 8 lab results from 2 storm days.
Clean WaterIndustrial stormwater
Within the state benchmarks
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2025-26
The facility sampled 2 of the 14 storms of a tenth of an inch or more near the site in 2025-26.
The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred, storms did not produce a discharge, and storms fell outside operating hours.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Tested in 2025-26
Pollutant2025-26 averageBenchmarkLast five years
pH
7 to 7.12 results
6 to 9
Over in 0 of 4 years tested
All results for pH
Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.
8 results as a table
Sampled
Drainage area
Result
Feb 17, 2026
MP-1
7.1
Nov 20, 2025
MP-1
7
Feb 13, 2025
MP-1
6.5
Feb 1, 2024
MP-1
7
Dec 19, 2023
MP-1
6.5
Mar 29, 2023
MP-1
7
Mar 22, 2023
MP-1
7
Dec 27, 2022
MP-1
7
Suspended solids
14 mg/L2 results
100 mg/L
Over in 0 of 4 years tested
All results for suspended solids
Mud and fine particles that cloud water, bury habitat, and carry other pollutants.
8 results as a table
Sampled
Drainage area
Result
Feb 17, 2026
MP-1
10 mg/L
Nov 20, 2025
MP-1
18 mg/L
Feb 13, 2025
MP-1
23 mg/L
Feb 1, 2024
MP-1
5.2 mg/L
Dec 19, 2023
MP-1
8.4 mg/L
Mar 29, 2023
MP-1
3.4 mg/L
Mar 22, 2023
MP-1
2 mg/L
Dec 27, 2022
MP-1
10 mg/L
Oil and grease
Not detected2 results
15 mg/L
Over in 0 of 4 years tested
All results for oil and grease
Coats plants and animals and blocks oxygen from entering the water.
8 results as a table
Sampled
Drainage area
Result
Feb 17, 2026
MP-1
Not detected
Nov 20, 2025
MP-1
Not detected
Feb 13, 2025
MP-1
Not detected
Feb 1, 2024
MP-1
Not detected
Dec 19, 2023
MP-1
Not detected
Mar 29, 2023
MP-1
Not detected
Mar 22, 2023
MP-1
Not detected
Dec 27, 2022
MP-1
Not detected
Iron
0.41 mg/L2 results
1 mg/L
Over in 0 of 4 years tested
All results for iron
Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.
8 results as a table
Sampled
Drainage area
Result
Feb 17, 2026
MP-1
0.15 mg/L
Nov 20, 2025
MP-1
0.67 mg/L
Feb 13, 2025
MP-1
0.61 mg/L
Feb 1, 2024
MP-1
0.36 mg/L
Dec 19, 2023
MP-1
0.32 mg/L
Mar 29, 2023
MP-1
0.21 mg/L
Mar 22, 2023
MP-1
0.092 mg/L
Dec 27, 2022
MP-1
2.4 mg/L
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
2 of 14 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; storms fell outside operating hours
2024-25
1 of 13 storms sampledTold the state it did not sample every required storm
2023-24
2 of 22 storms sampledTold the state it did not sample every required storm
2022-23
3 of 14 storms sampledTold the state it did not sample every required storm
2021-22
0 of 0 storms sampledNo annual report on file
2020-21
0 of 0 storms sampledNo annual report on file
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station Martinez 0.8 SSE (US1CACC0001), 2.4 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to Walnut Creek.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 3,276 people live in the neighborhood around this site in Martinez. The state scores it above 68% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6013320001. The score covers the whole neighborhood and does not measure this site's own effect.