EarthSpotterEarthSpotter

Asbury Graphite

2855 Franklin Canyon Rd, Rodeo, CA 94572

Asbury Graphite Mills Inc has held an industrial stormwater permit for the site since April 1992. Its industry is listed as manufacturing industries. The permit requires samples of its runoff, and the last one it filed is from January 2023.

2855 Franklin Canyon Rd, Rodeo

Industrial stormwater

This site last filed a sample of its runoff in January 2023.

The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled none of the 15 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Not tested in the latest year

Figures are from the last year each was tested.

pH

6.17 to 6.171 result

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

10 results as a table
SampledDrainage areaResult
Jan 11, 2023Storm Drains A, B, & C6.2
Jan 16, 2020Storm Drains A, B, & C6.8
Dec 4, 2019Storm Drains A, B, & C7.2
Jan 16, 2019Storm Drains A, B, & C8.6
Nov 29, 2018Storm Drains A, B, & C7.6
Jan 18, 2018Storm Drains A, B, & C5.8
Dec 3, 2015Storm Drains A, B, & C6.1
Dec 3, 2015All6.1
Nov 24, 2015Storm Drains A, B, & C6.6
Nov 24, 2015All6.6

Suspended solids

1.3 mg/L1 result

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

10 results as a table
SampledDrainage areaResult
Jan 11, 2023Storm Drains A, B, & C1.3 mg/L
Jan 16, 2020Storm Drains A, B, & C7 mg/L
Dec 4, 2019Storm Drains A, B, & C8 mg/L
Jan 16, 2019Storm Drains A, B, & C5 mg/L
Nov 29, 2018Storm Drains A, B, & CNot detected
Jan 18, 2018Storm Drains A, B, & CNot detected
Dec 3, 2015Storm Drains A, B, & C26 mg/L
Dec 3, 2015All26 mg/L
Nov 24, 2015Storm Drains A, B, & C12 mg/L
Nov 24, 2015All12 mg/L

Oil and grease

2.9 mg/L1 result

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

11 results as a table
SampledDrainage areaResult
Jan 11, 2023Storm Drains A, B, & C2.9 mg/L
Jan 16, 2020Storm Drains A, B, & CNot detected
Dec 4, 2019Storm Drains A, B, & CNot detected
Jan 16, 2019Storm Drains A, B, & CNot detected
Nov 29, 2018Storm Drains A, B, & CNot detected
Jan 18, 2018Storm Drains A, B, & CNot detected
Oct 14, 2016Storm Drains A, B, & CNot detected
Dec 3, 2015Storm Drains A, B, & CNot detected
Dec 3, 2015All35 mg/L
Nov 24, 2015Storm Drains A, B, & CNot detected
Nov 24, 2015All1.8 mg/L

Also tested, with no state benchmark to compare against: 4 results for electrical conductivity @ 25 deg. C.

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 15 storms sampledTold the state it did not sample every required storm

2024-25

0 of 14 storms sampledTold the state it did not sample every required storm

2023-24

0 of 22 storms sampledTold the state it did not sample every required storm

2022-23

0 of 17 storms sampledTold the state it sampled every required storm

2021-22

0 of 10 storms sampledTold the state it sampled every required storm

2020-21

0 of 14 storms sampledTold the state it sampled every required storm

Rainfall comes from the daily records of NOAA station Martinez 2.2 SW (US1CACC0011), 5.5 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Rodeo Creek.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 3,698 people live in the neighborhood around this site in Martinez. The state scores it above 49% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6013356001. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Manufacturing Industries, NEC
Operator
Asbury Graphite Mills Inc
Covered by
Industrial stormwater permit
Stormwater permit since
April 1992
Site size
6.33 acres
Paved or roofed
85% of the site
State stormwater ID
2 07I003729

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report