Dependable Highway Express has held an industrial stormwater permit for the site since May 2022. Its industry is listed as local trucking with storage. The permit requires samples of its runoff, and the last one it filed is from November 2023.
200 Halcyon Drive, San Leandro
Industrial stormwater
This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 15 storms of a tenth of an inch or more near it.
The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from November 2023.
Clean WaterIndustrial stormwater
Missing samples
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2023-24
The facility sampled none of the 21 storms of a tenth of an inch or more near the site in 2023-24.
The permit generally requires samples from four storms a year, with few exceptions.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Tested once or twice and within the benchmark: pH, suspended solids, oil and grease.
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
0 of 15 storms sampledNo annual report on file
2024-25
0 of 13 storms sampledTold the state it did not sample every required storm
2023-24
0 of 21 storms sampledTold the state it did not sample every required storm
2022-23
1 of 14 storms sampledTold the state it did not sample every required storm
2021-22
0 of 0 storms sampledTold the state it did not sample every required storm
2020-21
0 of 0 storms sampledNo annual report on file
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station Hayward Air Terminal (USW00093228), 3.3 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to San Francisco Bay.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 4,069 people live in the neighborhood around this site in San Leandro. The state scores it above 56% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6001433102. The score covers the whole neighborhood and does not measure this site's own effect.
Same operator
Dependable Highway Express holds 5 other stormwater permits: