Wylatti Enterprises LLC has held an industrial stormwater permit for the site since October 2018. Its industry is listed as construction sand and gravel. The permit requires samples of its runoff, and the last one it filed is from February 2026. Under its stormwater permit it is at Exceedance Response Action Level 2 for nitrate and nitrite, which means it must file an action plan with the state.

Georgia Pacific Industrial Road, Fort Bragg

Industrial stormwater

This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 21 storms of a tenth of an inch or more near it.

The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from February 2026.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 1 of the 21 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because all stormwater was retained on site.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

Nitrate and nitrite

0.57 mg/L2 results

0.68 mg/L

Exceedance Response Action Level 2

All results for nitrate and nitrite

Feeds algae blooms that strip oxygen from creeks and lagoons.

6 results as a table
SampledDrainage areaResult
Feb 25, 20262nd Crossing0.57 mg/L
Feb 25, 20262nd Crossing0.57 mg/L
Mar 20, 20232nd Crossing0.081 mg/L
Dec 12, 20222nd Crossing1.5 mg/L
Dec 16, 20212nd Crossing0.34 mg/L
Oct 25, 20212nd Crossing1.7 mg/L

Oil and grease

Not detected2 results

15 mg/L

Exceedance Response Action Level 1

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

6 results as a table
SampledDrainage areaResult
Feb 25, 20262nd CrossingNot detected
Feb 25, 20262nd CrossingNot detected
Mar 20, 20232nd Crossing3.4 mg/L
Dec 12, 20222nd Crossing43 mg/L
Dec 16, 20212nd CrossingNot detected
Oct 25, 20212nd CrossingNot detected

pH

8.3 to 8.32 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

3 results as a table
SampledDrainage areaResult
Feb 25, 20262nd Crossing8.3
Feb 25, 20262nd Crossing8.3
Oct 25, 20212nd Crossing7.6

Suspended solids

14 mg/L2 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

6 results as a table
SampledDrainage areaResult
Feb 25, 20262nd Crossing14 mg/L
Feb 25, 20262nd Crossing14 mg/L
Mar 20, 20232nd Crossing29 mg/L
Dec 12, 20222nd Crossing4.9 mg/L
Dec 16, 20212nd Crossing10 mg/L
Oct 25, 20212nd Crossing17 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

1 of 21 storms sampledTold the state: all stormwater was retained on site

2024-25

0 of 22 storms sampledTold the state it did not sample every required storm

2023-24

0 of 31 storms sampledTold the state it did not sample every required storm

2022-23

2 of 22 storms sampledTold the state it did not sample every required storm

2021-22

2 of 25 storms sampledTold the state it did not sample every required storm

2020-21

0 of 20 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Fort Bragg 5 N (USC00043161), 3.8 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Ten Mile River.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 4,474 people live in the neighborhood around this site in Fort Bragg. The state scores it above 37% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6045010300. The score covers the whole neighborhood and does not measure this site's own effect.

Same operator

Wylatti Enterprises LLC holds 2 other stormwater permits:

Permits and IDs

Industry
Construction Sand and Gravel
Operator
Wylatti Enterprises LLC
Covered by
Industrial stormwater permit
Stormwater permit since
October 2018
Site size
18.6 acres
Paved or roofed
10% of the site
State stormwater ID
1 23I027911