Kernen Construction has held an industrial stormwater permit for the site since July 2021. Its industry is listed as crushed and broken stone. Every pollutant it tested in 2025-26 averaged within the state benchmarks.

234 Bear Butte Road, Miranda

Industrial stormwater

During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.

That is based on 12 lab results from 4 storm days.

Clean WaterIndustrial stormwater

Within the state benchmarks

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 3 of the 25 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

pH

6.9 to 7.44 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

19 results as a table
SampledDrainage areaResult
Apr 2, 2026Ditch north end of scales7.4
Mar 5, 2026Ditch north end of scales7.3
Dec 22, 2025Ditch north end of scales7.2
Dec 18, 2025Ditch north end of scales6.9
Mar 31, 2025Ditch north end of scales7.6
Mar 28, 2025Ditch north end of scales7.5
Jan 2, 2025Ditch north end of scales7.3
Dec 16, 2024Ditch north end of scales7.3
Mar 22, 2024Ditch north end of scales6.9
Mar 11, 2024Ditch north end of scales6.9
Dec 18, 2023Ditch north end of scales7.8
Dec 8, 2023Ditch north end of scales7.2
Mar 13, 2023Ditch north end of scales7.3
Jan 13, 2023Ditch north end of scales7.4
Dec 8, 2022Ditch north end of scales6.9
May 5, 2022Ditch north end of scales6.8
Apr 14, 2022Ditch north end of scales6.9
Nov 5, 2021Ditch north end of scales6.9
Nov 1, 2021Ditch north end of scales7.4

Suspended solids

2.5 mg/L4 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

19 results as a table
SampledDrainage areaResult
Apr 2, 2026Ditch north end of scalesNot detected
Mar 5, 2026Ditch north end of scales1.4 mg/L
Dec 22, 2025Ditch north end of scales4.9 mg/L
Dec 18, 2025Ditch north end of scales3.6 mg/L
Mar 31, 2025Ditch north end of scales10 mg/L
Mar 28, 2025Ditch north end of scales3.5 mg/L
Jan 2, 2025Ditch north end of scales1.1 mg/L
Dec 16, 2024Ditch north end of scales1.5 mg/L
Mar 22, 2024Ditch north end of scales2 mg/L
Mar 11, 2024Ditch north end of scales6.8 mg/L
Dec 18, 2023Ditch north end of scales1.8 mg/L
Dec 8, 2023Ditch north end of scales5.9 mg/L
Mar 13, 2023Ditch north end of scales14 mg/L
Jan 13, 2023Ditch north end of scales2.9 mg/L
Dec 8, 2022Ditch north end of scales170 mg/L
May 5, 2022Ditch north end of scales25 mg/L
Apr 14, 2022Ditch north end of scales1.1 mg/L
Dec 16, 2021Ditch north end of scales2.8 mg/L
Nov 1, 2021Ditch north end of scales14 mg/L

Oil and grease

Not detected4 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

19 results as a table
SampledDrainage areaResult
Apr 2, 2026Ditch north end of scalesNot detected
Mar 5, 2026Ditch north end of scalesNot detected
Dec 22, 2025Ditch north end of scalesNot detected
Dec 18, 2025Ditch north end of scalesNot detected
Mar 31, 2025Ditch north end of scalesNot detected
Mar 28, 2025Ditch north end of scalesNot detected
Jan 2, 2025Ditch north end of scalesNot detected
Dec 16, 2024Ditch north end of scalesNot detected
Mar 22, 2024Ditch north end of scalesNot detected
Mar 11, 2024Ditch north end of scalesNot detected
Dec 18, 2023Ditch north end of scalesNot detected
Dec 8, 2023Ditch north end of scalesNot detected
Mar 13, 2023Ditch north end of scalesNot detected
Jan 13, 2023Ditch north end of scalesNot detected
Dec 8, 2022Ditch north end of scalesNot detected
May 5, 2022Ditch north end of scalesNot detected
Apr 14, 2022Ditch north end of scalesNot detected
Nov 5, 2021Ditch north end of scalesNot detected
Nov 1, 2021Ditch north end of scalesNot detected

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

3 of 25 storms sampledTold the state it sampled every required storm

2024-25

3 of 18 storms sampledTold the state it sampled every required storm

2023-24

4 of 26 storms sampledTold the state it sampled every required storm

2022-23

3 of 26 storms sampledTold the state it did not sample every required storm

2021-22

4 of 25 storms sampledTold the state it sampled every required storm

2020-21

0 of 0 storms sampledNo annual report on file

Rainfall comes from the daily records of NOAA station Bridgeville 5.2 ENE (US1CAHM0026), 20 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Unnamed Tributary to Butte Creek.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 1,719 people live in the neighborhood around this site in Garberville. The state scores it above 39% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6023011501. The score covers the whole neighborhood and does not measure this site's own effect.

Same operator

Kernen Construction holds 2 other stormwater permits:

Permits and IDs

Industry
Crushed and Broken Stone, NEC
Operator
Kernen Construction
Covered by
Industrial stormwater permit
Stormwater permit since
July 2021
Site size
65 acres
Paved or roofed
0% of the site
State stormwater ID
1 12I029287

The state stormwater record

Other sites nearby

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report