Waterway Marine

Facility Overview

Waterway Marine is operating under a active permit of type: Industrial. Primary industry: Ship Building and Repairing.

The facility covers a total area of 1 Acres, with an active operational area of 0.75 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, this facility directly affects the San Rafael Creek. This information is crucial for understanding the facility's potential environmental influence on local water resources.

145 3rd Street, San Rafael, CA 94901

Additional Details

Permit Status: Active
County: Marin
WDID: 2 21I026998
Application ID: 460113

Historical Exceedances

This facility has historically exceeded limits for the following parameters:

  • pH

    pH levels outside the normal range can harm aquatic life and affect water chemistry. Acidic water can leach toxic metals from sediments, while alkaline water can increase ammonia toxicity.

These limits reflect Water Quality Standards promulgated to protect human health or the environment, or standards that the State or EPA developed to indicate the Facility may be failing to implement best practices to protect storm water.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
202420Up To Date
202320Up To Date
202120Up To Date
202010Up To Date
201930Up To Date
201831Exceedances Detected
201720Up To Date

Discharge Report Exceedances Trend

This chart shows the trend of discharge report exceedances over time. The values represent the number of exceedances for each year.