Sully Miller Contracting

Facility Overview

Sully Miller Contracting is operating under a active permit of type: Industrial. Primary industry: Ready.

The facility covers a total area of 24.43 Acres, with an active operational area of 24.43 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, this facility indirectly affects the Oro Grande Wash. This information is crucial for understanding the facility's potential environmental influence on local water resources.

11412 Fashion Court, Hesperia, CA 92880

Additional Details

Permit Status: Active
County: San Bernardino
WDID: 6B36I029850
Application ID: 552071

Historical Exceedances

This facility has historically exceeded limits for the following parameters:

  • Iron, Total

    Excessive iron can harm aquatic ecosystems by forming precipitates that smother habitats. It can also affect fish gills and reduce visibility in water.

These limits reflect Water Quality Standards promulgated to protect human health or the environment, or standards that the State or EPA developed to indicate the Facility may be failing to implement best practices to protect storm water.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
202431Exceedances Detected
202310Up To Date

Discharge Report Exceedances Trend

This chart shows the trend of discharge report exceedances over time. The values represent the number of exceedances for each year.