Redwood Empire

Facility Overview

Redwood Empire is operating under a active permit of type: Industrial. Primary industry: Sawmills and Planing Mills, General. Secondary industry: Sawmills and Planing Mills, General.

The facility covers a total area of 24 Acres, with an active operational area of 24 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, the facility directly affects the Oat Valley Cr and the downstream waters. This information is crucial for understanding the facility's potential environmental influence on local water resources.

31401 Mccray Rd, Cloverdale, CA 95425

Additional Details

Permit Status: Active
County: Sonoma
WDID: 1 49I006163
Application ID: 178833

The information displayed on the map and this report is derived from publicly available data, including reports submitted through the California State Water Resources Control Board's SMARTS database, and is provided for informational purposes only. Blanks or missing data reflects a lack of data provided by the facility or improperly uploaded data. Facilities identified on this map as having exceedances, missing reports, or other potential issues are flagged as suspected of non-compliance only. A flag on this map does not mean a facility has been found, or is, in violation of the IGP or any other law.

Historical Exceedances

This facility has historically exceeded limits for the following parameters:

  • Chemical Oxygen Demand (COD)

    High COD indicates the presence of organic pollutants. It can lead to oxygen depletion in water bodies, harming aquatic life.

These limits reflect Water Quality Standards promulgated to protect human health or the environment, or standards that the State or EPA developed to indicate the Facility may be failing to implement best practices to protect storm water.

Most IGP facilities are required to collect storm water samples four times per year during qualifying storm events. Where fewer than four samples are shown below, the facility may not be meeting this requirement. When a facility fails to sample at the required frequency, or samples outside of qualifying events, the resulting data may not accurately reflect its actual discharges to receiving waters. As a result, missing or incomplete sampling data can make a facility's reports appear to show less environmental impact than is actually occurring.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
202421Exceedances Detected
202330Up To Date
202220Up To Date
202110Up To Date
202021Exceedances Detected
201920Up To Date
201871Exceedances Detected
201771Exceedances Detected
201662Exceedances Detected