Palmdale Batch Plant

Facility Overview

Palmdale Batch Plant is operating under a active permit of type: Industrial. Primary industry: Ready. Secondary industry: Construction Sand and Gravel.

The facility covers a total area of 280 Acres, with an active operational area of 89 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, this facility indirectly affects the Groundwater. This information is crucial for understanding the facility's potential environmental influence on local water resources.

37790 75th St E, Palmdale, CA 93552

Additional Details

Permit Status: Active
County: Los Angeles
WDID: 6B19I002865
Application ID: 204284

Discharge Reports Summary

YearSample ReportsExceedancesStatus
000Up To Date

Discharge Report Exceedances Trend

This chart shows the trend of discharge report exceedances over time. The values represent the number of exceedances for each year.