National Railroad Passenger

Facility Overview

National Railroad Passenger is operating under a active permit of type: Industrial. Primary industry: Railroads, Line.

The facility covers a total area of 100000 SqFt, with an active operational area of 10000 Sqft.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, the facility directly affects the San Diego Bay and the downstream waters. This information is crucial for understanding the facility's potential environmental influence on local water resources.

1050 Kettner Blvd, San Diego, CA 92101

Additional Details

Permit Status: Active
County: San Diego
WDID: 9 37I014244
Application ID: 218630

The information displayed on the map and this report is derived from publicly available data, including reports submitted through the California State Water Resources Control Board's SMARTS database, and is provided for informational purposes only. Blanks or missing data reflects a lack of data provided by the facility or improperly uploaded data. Facilities identified on this map as having exceedances, missing reports, or other potential issues are flagged as suspected of non-compliance only. A flag on this map does not mean a facility has been found, or is, in violation of the IGP or any other law.

Most IGP facilities are required to collect storm water samples four times per year during qualifying storm events. Where fewer than four samples are shown below, the facility may not be meeting this requirement. When a facility fails to sample at the required frequency, or samples outside of qualifying events, the resulting data may not accurately reflect its actual discharges to receiving waters. As a result, missing or incomplete sampling data can make a facility's reports appear to show less environmental impact than is actually occurring.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
202440Up To Date
202340Up To Date
202240Up To Date
202140Up To Date
202040Up To Date
201940Up To Date
201840Up To Date
201780Up To Date
201680Up To Date