Korbel Sawmill

Facility Overview

Korbel Sawmill is operating under a active permit of type: Industrial. Primary industry: Sawmills and Planing Mills, General.

The facility covers a total area of 447 Acres, with an active operational area of 150 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, the facility directly affects the North Fork of the Mad River and the downstream waters. This information is crucial for understanding the facility's potential environmental influence on local water resources.

1185 Maple Creek Road, Korbel, CA 95550

Additional Details

Permit Status: Active
County: Humboldt
WDID: 1 12I026913
Application ID: 478576

The information displayed on the map and this report is derived from publicly available data, including reports submitted through the California State Water Resources Control Board's SMARTS database, and is provided for informational purposes only. Blanks or missing data reflects a lack of data provided by the facility or improperly uploaded data. Facilities identified on this map as having exceedances, missing reports, or other potential issues are flagged as suspected of non-compliance only. A flag on this map does not mean a facility has been found, or is, in violation of the IGP or any other law.

Historical Exceedances

This facility has historically exceeded limits for the following parameters:

  • Chemical Oxygen Demand (COD)

    High COD indicates the presence of organic pollutants. It can lead to oxygen depletion in water bodies, harming aquatic life.

  • Total Suspended Solids (TSS)

    High levels of suspended solids can reduce water clarity, harm fish gills, smother aquatic habitat and eggs, and transport pollutants through water bodies.

These limits reflect Water Quality Standards promulgated to protect human health or the environment, or standards that the State or EPA developed to indicate the Facility may be failing to implement best practices to protect storm water.

Most IGP facilities are required to collect storm water samples four times per year during qualifying storm events. Where fewer than four samples are shown below, the facility may not be meeting this requirement. When a facility fails to sample at the required frequency, or samples outside of qualifying events, the resulting data may not accurately reflect its actual discharges to receiving waters. As a result, missing or incomplete sampling data can make a facility's reports appear to show less environmental impact than is actually occurring.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
202440Up To Date
202350Up To Date
202251Exceedances Detected
202142Exceedances Detected
202080Up To Date
2019100Up To Date
201860Up To Date
201750Up To Date