Holtville Clay Pit

Facility Overview

Holtville Clay Pit is operating under a active permit of type: Industrial. Primary industry: Construction Sand and Gravel.

The facility covers a total area of 28.7 Acres, with an active operational area of 28.7 Acres.

The site has self-reported imperviousness of 1%. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, this facility indirectly affects the Salton Sea. This information is crucial for understanding the facility's potential environmental influence on local water resources.

Holtville Clay Pit, Holtville, CA 92250

Additional Details

Permit Status: Active
County: Imperial
WDID: 7 13I025698
Application ID: 456727

Discharge Reports Summary

YearSample ReportsExceedancesStatus
000Up To Date

Discharge Report Exceedances Trend

This chart shows the trend of discharge report exceedances over time. The values represent the number of exceedances for each year.