Hanson Pipe Precast

Facility Overview

Hanson Pipe Precast is operating under a active permit of type: Industrial. Primary industry: Concrete Products, Except Block and Brick.

The facility covers a total area of 44 Acres, with an active operational area of 35 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, the facility directly affects the Unidentified infiltration to northwest Kern Refuge Regional Basin WtrshedSouthern San Joaquin Valley and the downstream waters. This information is crucial for understanding the facility's potential environmental influence on local water resources.

30781 San Diego St, Shafter, CA 93263

Additional Details

Permit Status: Active
County: Kern
WDID: 5F15I016046
Application ID: 196183

The information displayed on the map and this report is derived from publicly available data, including reports submitted through the California State Water Resources Control Board's SMARTS database, and is provided for informational purposes only. Blanks or missing data reflects a lack of data provided by the facility or improperly uploaded data. Facilities identified on this map as having exceedances, missing reports, or other potential issues are flagged as suspected of non-compliance only. A flag on this map does not mean a facility has been found, or is, in violation of the IGP or any other law.

Most IGP facilities are required to collect storm water samples four times per year during qualifying storm events. Where fewer than four samples are shown below, the facility may not be meeting this requirement. When a facility fails to sample at the required frequency, or samples outside of qualifying events, the resulting data may not accurately reflect its actual discharges to receiving waters. As a result, missing or incomplete sampling data can make a facility's reports appear to show less environmental impact than is actually occurring.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
000Up To Date