Half Moon Bay Bldg Inc

Facility Overview

Half Moon Bay Bldg Inc is operating under a active permit of type: Industrial. Primary industry: Ready.

The facility covers a total area of 1 Acres, with an active operational area of 1 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, the facility directly affects the Pacific Ocean and the downstream waters. This information is crucial for understanding the facility's potential environmental influence on local water resources.

119 Main St, Half Moon Bay, CA 94019

Additional Details

Permit Status: Active
County: San Mateo
WDID: 2 41I014757
Application ID: 182941

The information displayed on the map and this report is derived from publicly available data, including reports submitted through the California State Water Resources Control Board's SMARTS database, and is provided for informational purposes only. Blanks or missing data reflects a lack of data provided by the facility or improperly uploaded data. Facilities identified on this map as having exceedances, missing reports, or other potential issues are flagged as suspected of non-compliance only. A flag on this map does not mean a facility has been found, or is, in violation of the IGP or any other law.

Historical Exceedances

This facility has historically exceeded limits for the following parameters:

  • Iron, Total

    Excessive iron can harm aquatic ecosystems by forming precipitates that smother habitats. It can also affect fish gills and reduce visibility in water.

  • Total Suspended Solids (TSS)

    High levels of suspended solids can reduce water clarity, harm fish gills, smother aquatic habitat and eggs, and transport pollutants through water bodies.

These limits reflect Water Quality Standards promulgated to protect human health or the environment, or standards that the State or EPA developed to indicate the Facility may be failing to implement best practices to protect storm water.

Most IGP facilities are required to collect storm water samples four times per year during qualifying storm events. Where fewer than four samples are shown below, the facility may not be meeting this requirement. When a facility fails to sample at the required frequency, or samples outside of qualifying events, the resulting data may not accurately reflect its actual discharges to receiving waters. As a result, missing or incomplete sampling data can make a facility's reports appear to show less environmental impact than is actually occurring.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
202421Exceedances Detected
202321Exceedances Detected
202221Exceedances Detected
202133Exceedances Detected
202011Exceedances Detected
201934Exceedances Detected
201844Exceedances Detected
201745Exceedances Detected
201644Exceedances Detected