Global Power Technologies Group

Facility Overview

Global Power Technologies Group is operating under a active permit of type: Industrial. Primary industry: Semiconductors and Related Devices.

The facility covers a total area of 39030 SqFt, with an active operational area of 0 Sqft.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, this facility indirectly affects the NA. This information is crucial for understanding the facility's potential environmental influence on local water resources.

20692 Prism Place, Lake Forest, CA 92630

Additional Details

Permit Status: Active
County: Orange
WDID: 8 30NEC001385
Application ID: 462852

Discharge Reports Summary

YearSample ReportsExceedancesStatus
000Up To Date

Discharge Report Exceedances Trend

This chart shows the trend of discharge report exceedances over time. The values represent the number of exceedances for each year.