Boundary Bend Olives

Facility Overview

Boundary Bend Olives is operating under a active permit of type: Industrial. Primary industry: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, NEC.

The facility covers a total area of 8 Acres, with an active operational area of 1.3 Acres.

The site has self-reported imperviousness of %. In the context of the Industrial General Permit for stormwater runoff, imperviousness refers to the percentage of the facility's surface area that doesn't allow water to penetrate, such as concrete, asphalt, or rooftops. The higher the imperviousness percentage, the more potential impact on local water quality as there is a greater surface area to accumulate pollutants.

In terms of water impact, this facility directly affects the Kentucky Ditch. This information is crucial for understanding the facility's potential environmental influence on local water resources.

455 Harter Avenue, Woodland, CA 95776

Additional Details

Permit Status: Active
County: Yolo
WDID: 5S57I029094
Application ID: 528714

Historical Exceedances

This facility has historically exceeded limits for the following parameters:

  • Nitrite Plus Nitrate (as N)

    High levels contribute to nutrient pollution, leading to algal blooms, oxygen depletion, and potential toxic conditions for aquatic life.

  • Chemical Oxygen Demand (COD)

    High COD indicates the presence of organic pollutants. It can lead to oxygen depletion in water bodies, harming aquatic life.

  • Total Suspended Solids (TSS)

    High levels of suspended solids can reduce water clarity, harm fish gills, smother aquatic habitat and eggs, and transport pollutants through water bodies.

  • Biochemical Oxygen Demand (BOD) (5-day @ 20 Deg. C)

    Elevated BOD levels indicate high organic pollution, which can deplete oxygen in water, leading to fish kills and ecosystem imbalance.

These limits reflect Water Quality Standards promulgated to protect human health or the environment, or standards that the State or EPA developed to indicate the Facility may be failing to implement best practices to protect storm water.

Discharge Reports Summary

YearSample ReportsExceedancesStatus
202424Exceedances Detected
202335Exceedances Detected
202238Exceedances Detected

Discharge Report Exceedances Trend

This chart shows the trend of discharge report exceedances over time. The values represent the number of exceedances for each year.